Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Minor demolition with intallation of new partitions, doors, suspended ceilings and finishes on the third (3rd) floor, apt. 3f as per plans. no change to use, egress or occupancy.
Filing application for minor non-structural demolition and construction in cellar portion of duplex commercial unit. All work as per plans filed herewith. No change in use, egress or occupancy.
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Application is filed for interior demolition andrenovation in cellar that doesn't affect use, egress oroccupancy of the space, and therefore, no new or amendedcertificate of occupancy is required
Minor demolition with intallation of new partitions, doors, suspended ceilings and finishes on the third (3rd) floor, apt. 3f as per plans. no change to use, egress or occupancy.
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Demolition of non-load bearing paritions, intallation of new partitions, doors, suspended ceilings and finishes on the eighth (8th) floor, apt. 8a as per plans. no change to use, egress or occupancy.
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
installation of construction fence to protect site during full demolition
Interior renovation to include demolition and construction of partitions in an existing office space. No change is use, egress, or occupancy.
Interior demolition of non load bearing partitions on the 20th floor as indicated on drawings.
Photo studio-- interior demolition inclusive of partitions removals as per plans filed herewith. no change to use, egress, or occupancy.
exterior renovation to include demolition of existing and construction of new partitions in Storefront - Retail D Space for existing office space. no change in use, egress, or occupancy.
Partial demolition and reframing for new slab openings and partitions. Associated structural reinforcement. No change to use, egress, or occupancy.
Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 7th floor as per plans (Hines - Demo, Whitebox & Stair Infill) No change to...
installation of construction fence to protect site during full demolition
Exterior renovation to include demolition of existing and construction of new partitions in Storefront - Retail D Space for existing office space. no change in use, egress, or occupancy.
Interior non-structural demolition as shown on the plans.
Interior renovation to include demolition and construction of partitions in an existing office space. No change is use, egress, or occupancy.
construction fence will be used to protect site, during full demolition.