Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Partial Demolition of East Facade to create access opening for construction hoist
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 17-18th Floor as per plans (Lowenstein Sandler LLP - Renovations.) No change to use...
Interior demolition of non load bearing partitions on the 1st floor and modification of existing storefront as indicated on drawings.
Replacement of existing gas dryers in existing laundry room. minor non-structural demolition of interior partition walls. no change in use, egress, or occupancy.
Demolition of rear wall. Provide shoring for demolition of rear wall. Reinforcement of existing framing with sistered members and steel beams. Reinforcement of rear wall with steel moment frame. No ch...
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Interior demolition of mom-load bearing partitions, doors, ceilings.
Interior Demolition of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on 12th Floor. No Change to Occupancy, Use or Egress is Proposed
1st floor space whiteboxing: demolition, new partitions, new finishes etc. as per plan. no change in use, egress or occupancy.
Alteration to create new accessory amenity spaces for the building tenants from portions of the existing 3rd and 4th floor office spaces. scope of work to include general construction inclusive of dem...
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 25-26 and 28th Floor as per plans (DLA Piper.) No change to use, egress or occupanc...
Interior demolition work as shown on plans .No change in use, egress or occupancy.
Interior Demolition of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on 12th Floor. No Change to Occupancy, Use or Egress is Proposed
Alteration to create new accessory amenity spaces for the building tenants from portions of the existing 3rd and 4th floor office spaces. scope of work to include general construction inclusive of dem...
Interior demolition work as shown on plans .No change in use, egress or occupancy.
1st floor space whiteboxing: demolition, new partitions, new finishes etc. as per plan. no change in use, egress or occupancy.
Demolition of rear wall. Provide shoring for demolition of rear wall. Reinforcement of existing framing with sistered members and steel beams. Reinforcement of rear wall with steel moment frame. No ch...
Interior demolition of mom-load bearing partitions, doors, ceilings.
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 25-26 and 28th Floor as per plans (DLA Piper.) No change to use, egress or occupanc...