Demolition Permits in Manhattan, New York
923 demolition permits filed recently
923 permits
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Interior renovation in apartment #17 on 5th floor of existing 5 story building. demolition work and construction work as per plan. repairing partition, flooring, ceiling and painting throughout, no ch...
Combination of two residential units including demolition and reconfiguration. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes.
Renovation of an existing apartment #14B on the 13th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
General Construction demolition work taking place on floors 001-003 as per plans filed herewith. No change in Use, Egress or Occupancy.
8'-0 high construction fence to be erected along the perimeter of structure to undergo demolition and construction operations.
Herewith filing for interior demolition of existing mechanical systems in subcellar #1 as per plans. no change to use occupancy or egress.
Filed pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conversion including partial demolition and permitted reconstruction...
Interior demolition of non structural partitions and interior renovation of existing apartment h-206 on 2nd floor no change in use egress or occupancy
Interior demolition of non structural partitions and interior renovation of existing apartment h-206 on 2nd floor no change in use egress or occupancy
Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on Part of 16th Floor. No Change to Occupancy, Use or Egress is Proposed
FILING FOR DEMOLITION OF METAL STAIR FROM 22nd TO 23rd FLOOR. INFILL OF EXISTING SLAB OPENING ON 23rd FLOOR WITH NEW SLAB CONSTRUCTION SUPPORTED BY STEEL BEAMS.
interior demolition of non-bearing partitions in the existing doctors' office.
Minor Demolition of the mechanical system on the Cellar, 1-5 Floors as per plans. No change to use, egress or occupancy
Interior renovation and combination of existing apt. 4A and 4BB. Work to include non-structural demolition, general construction, and finishes. apartment combined in compliance with TPPN 3/97. No chan...
Interior renovation consisting of demolition and construction of non-load bearing partitions & lighting. No change in use, egress or occupancy.
General construction modifications with interior demoliation taking place on the 8th fl as per drawings filed herewith. no change in use, egress or occupancy.
Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01314553.
Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01314553.
General construction modifications with interior demoliation taking place on the 8th fl as per drawings filed herewith. no change in use, egress or occupancy.