Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
5TH FLOOR DEMO-- PRE-TENANT INTERIOR NON-STRUCTURAL DEMOLITION INCLUSIVE OF PARTITIONS REMOVALS AS PER PLANS FILED. No change to use, egress, or occupancy.
Full demolition of foundation.
Interior renovation of apt. 55a with minor demolition. remove & relocate non load bearing partitions & ceilings per plans. no change in egress, occupancy or use is involved under this application.
interior demolition and construction for white box on 9th floor
full demolition of four story structure, using hand held and mechanical means to assist from exterior.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (6 & 7 Floors- Tenant Name) as per plans. No change to use, egress or occupancy.
Hotel lobby renovation includes demolition of existing non loading bearing partitions. a new hotel lobby office and public restrooms, new finishes will be provided.
Full demolition of foundation.
5TH FLOOR DEMO-- PRE-TENANT INTERIOR NON-STRUCTURAL DEMOLITION INCLUSIVE OF PARTITIONS REMOVALS AS PER PLANS FILED. No change to use, egress, or occupancy.
Propose interior partition and finish demolition work at the cellar and 1st floor commercial space as per plan. No change in use egress, or occupancy.
Interior alteration related to the combination of two existing apartments #ph19 and #ph20-21, including demolition & general construction work. No change to use, occupancy or egress
Interior renovations to existing apt. #11G. Work to include non-structural demolition, general construction and finishes, as per plans filed herewith. No change in use, egress or occupancy.
Interior demolition of existing non-bearing gyp. bd. partitions. Installation of new non-bearing partitions, door, frames and finishes. No change in use, occupancy or egress
Interior renovation to apartment unit 3c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows and faade
5th floor- modification to existing sprinkler system, demolition of branch pipiing and sprinkler heads. installation of tcsp as per plans filed.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 12th floor as per plans. No change to use, egress or occupancy.
Interior renovation on apartment 4e on 4th floor including non-structural demolition and installation of interior walls and finishes as indicated on plans filed herewith. no change of use, egress or o...
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Minor interior renovation to apartment unit 1d,3c. partial non-structural demolition. installation of new partitions, lighting and finishes. no change to use, egress or occupancy. no work to windows a...
Partial demolition means & methods for portions of 2nd floor, mezzanine, 1st floor, escalator removal as per plans. this application is filed in conjunction with m01277980-s5.