Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary suspended scaffold equipment.
Herewith filing sprinkler modifications for NYU Langone HCC- Cath Lab Equipment HCC14 Project. No change in use, egress, or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the south (west 63rd st) and west elevations from the top of the sidewalk shed to past...
Installation of temporary work platform as per plan. no change in use, egress, or occupancy. the work platform on the 17th floor at the southeast corner allows customers to land the suspended scaffold...
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenwich st.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at washington street and carlisle street elevations..
Mechanical Work on 4th and 5th Floor
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Playground upgrade (new turfed area and tracks; painted plays on the ground; new safety surface and play equipment; new plants in enlarged platers). New ADA compliant toilet accessories. Patching tile...
Herewith filing for removal of interior non load bearing partitions and doors as per plans. no change to use, egress or occupancy under this application.
Filing for approval of support of excavation plans
Structural modifications taking place on the 38th and 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Mechanical work from the 2nd floor as plans filed herewith. no change in use, egress, or occupancy.
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Modifications of the existing sprinkler system and installation of TCSP. No change in use, egress of occupancy.
modification to systems as required to accommodate new tenant fitout
Sprinkler work at cellar and 1st floor