Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Structural framing and stair opening, as per plans. No change to use, egress, or occupancy.
Overhead protection for occupants at courtyard.
Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
structural work as shown on plans
Sprinkler modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
Mechanical Work as shown on plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Standpipe work as shown on plans filed herewith
Installation of suspended scaffold for facade work or inspection.
General Construction as shown on plans filed herewith. No change to use egress or occupancy.
General Construction Louver work taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Minor partition work in apt 10 with general Carpentry . No change to use bulk or egress
Sprinkler modifications taking place on the 40th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Filing herewith for installation of grease exhaust duct ( 12 ga black iron ), grease exhaust hood type - i, and makeup air supply system for first floor kitchen: relocate nfpa-96 compliant grease exha...
Sprinkler modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Minor partition work in apt 1 with general Carpentry . No change to use bulk or egress
Conversion of bldg (portions thereof) pursuant to Article I-Chapter 5(ZR), change of non-residential floor area to residences of any type proposed mixed use 2 family dwelling with non-residential use...
Interior demo of 19,20 & 21 floor interconnecting staircase approximately 750 square feet as per plans. No change in use, egress or occupancy.
Install and register one ac for the 1st floor restaurant. no change in use, egress or occupancy.
Modifications to sprinkler heads and related piping as per plans. No change in use, egress or occupancy.