Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Modification to exisiting sprinkler system,no change to use, egress, or occupancy.
Installation of a temporarily Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Conversion of dominant occupancy of building from offices to R-2 residential in accordance with the provisions of ZR Article I Chapter 5.
Interior tenant fit-out of existing eating & drinking establishment on cellar & first floor. no change to use, egress or occupancy.
Temporary standpipe modification to the the cellar as per plans filed herewith. no change in use, egress.
Filing for the following at the polo grounds towers 1, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
Filing for the following at the polo grounds towers 4, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
Filing for the following at the polo grounds towers 1, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
16th floor tenant build out, air handler and coolant system and new kitchen exhaust system for existing eating & drinking establishment as per lno # 3848. no changes to use, egress or occupancy.
Filing for approval of excavation and foundation
DASNY sprinkler work for elevator upgrade project at City University of New York's North Academic Center.
Installation of temporary pipe & system scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical work on the 10th floor (Ramboll) as indicated on drawings.
Mechanical work filed in conjunction with M01371067-I1.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary platform as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.