Renovation Permits in Manhattan, New York
4,148 renovation permits filed recently
4,148 permits
Facade Repairs. No change in use, egress, or occupancy.
Respectfully request to file for renovation to existing bedroom #3. No change in use, egress, or occupancy.
Cycle 9b facade repair work in compliance with ll 11/98 as per plans filed.
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress under this applicat...
Facade repairs as per plans. No change to use, egress or occupancy.
Installation and use of temporary suspended scaffold for facade inspection and repairs as per plans filed herewith. no change to use, egress, or occupancy under this application.
Suspended Scaffold installation for facade repairs and inspections
Propose to perform interior renovations. No change in use, egress or occupancy.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy
Install 3 ceiling mounted PTAC units and related ductwork, an exhaust fan and new diffusers in conjunction with the interior apartment renovation, as per plans filed herewith. No change to use, egress...
Interior renovation of a residential duplex apartment including select partition removal; millwork installations; cosmetic upgrades to kitchen, bathrooms and powder room; and painting. No proposed cha...
Interior renovation of existing apartment on the 18th floor Apt#18J. Architectural/construction work only.
Mechanical work for the renovation of the existing system as per plans. no change to use, egress or occupancy
Mechanical construction scope only associated with the renovation of the 005 FL at the New School. No change of use, egress or occupancy.
Interior renovation of apartment 15e on the 15th floor. no change in use, egress, or occupancy.
Filing for limited exterior repairs. No change in use, egress, or occupancy.
Interior renovation and vertical combination of apt. 1h and 2j. new stair between first and second floor. no change of use, egress or occupancy. combining 2 apartments comply with tppn 03/97.
Facade repairs
Interior renovation with partition work on the cellar through 3rd floor at an existing light manufacturing building. facade work as per lpc approval. no change in use, egress or occupancy.
Repair of existing fire rated walls in common hallways