Renovation Permits in Manhattan, New York
4,148 renovation permits filed recently
4,148 permits
Filing for limited exterior repairs. No change in use, egress, or occupancy.
Herewith filing for interior renovations in apts 5h and 11h as per plans. no change to use occupancy or egress.
Interior renovation of a residential duplex apartment including select partition removal; millwork installations; cosmetic upgrades to kitchen, bathrooms and powder room; and painting. No proposed cha...
Installation and use of temporary suspended scaffold for facade inspection and repairs as per plans filed herewith. no change to use, egress, or occupancy under this application.
Repair of existing fire rated walls in common hallways
Proposed installation of pipe scaffold for remedial repairs as per plans. pipe scaffold shall comply with chapter#33 of 2014 the ny building code. no change in use occupancy or egress under this appli...
Interior renovation of apartment 10d located on the 10th floor. altering interior partitions within the existingresidential unit. no change in use, occupancy, or egress.
Interior renovation to existing 4 residential units and proposing new fifth floor and stair bulkhead to existing 4 story strutcure with cellar.
Interior renovation on cellar floor for apt #gla. no chance of use, egress, or occupancy
Interior renovation existing restaurant with partition work on 1st floor. no change in use, egress or occupancy.
Filing for repairs to this existing parking garage. No change to use, egress or occupancy.
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
Miscellaneous facade repairs as per plans. no change in use, egress or occupancy
Filing herewith general construction to include interior renovation and minor demo of existing apartment as per plans
Hereby filing to construct new interior partitions, ceilings and doors for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Proposed interior renovation of 4fl apt#4f of existing 4 story building.to replace existing flooring, ceiling, new painting throughout, construction as per plan. no change in egress, use, or occupancy...
Concrete parking structure repairs. no change in use, egress or occupancy.
Facade repairs as shown on the drawings filed herewith. no change in use, egress or occupancy.
Exterior facade and leak repairs including brick replacement, brick repointing, concrete cover removal, concrete repairs, lintel repairs, and mechanical louver replacement per plans submitted herewith...
Hereby filing to install mechanical units with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.