Demolition Permits in Manhattan, New York
922 demolition permits filed recently
922 permits
installation of construction fence to protect site, during full demolition
Renovation of an existing apartment on the third floor. work includes non-structural demolition, general construction
Equipment use, Temp Shoring and Chute for the demolition.
installation of construction fence to protect site, during full demolition.
Scope of work includes support for infrastructure scope including demolition of newand infill of existing penetration through an existing foundation wall.
installation of construction fence to protect site, during full demolition
Renovation of an existing single family dwelling. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
Renovation of an existing apartment on the third floor. work includes non-structural demolition, general construction
Use of chute at the time of full demolition in conjunction with the demo application
Full demolition to a five story building
Partial demolition work to include removal of non-structural masonry wall for new thru-wall self-condenser unit installation below window sill. No structural member will be affected by this work.
Interior demolition on partial 5th floor including removal of partitions and finishes in the existing office suite as per plans filed herewith only. No change to zoning, use, egress, or occupancy.
SUBSEQUENT STRUCTURAL APPLICATION FILED HEREWITH. (Structural work including partial demolition and all new structural support elements as shown on filed plans.)
Interior renovations of existing apartment #5B. Work to include non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
Full demolition to a five story building
Full demolition to a five story building
Use of chute at the time of full demolition in conjunction with the demo application
Interior demolition on partial 5th floor including removal of partitions and finishes in the existing office suite as per plans filed herewith only. No change to zoning, use, egress, or occupancy.
Interior renovations of existing apartment #5B. Work to include non-structural demolition, general construction, and finishes. No change in use, egress, or occupancy.
Partial demolition work to include removal of non-structural masonry wall for new thru-wall self-condenser unit installation below window sill. No structural member will be affected by this work.