Demolition Permits in Manhattan, New York
922 demolition permits filed recently
922 permits
Demolition of doors, fixtures and finishes. New partitions, fixtures, finishes, and doors.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes in the basement & Storefront (LL Work) as per plans. No change to use, egress or occupancy.
Interior soft demolition of existing store to include removal of existing partitions and mill work. No change to use, egress or occupancy.
Hereby filing to demolish and construct interior partitions, millwork, cabinetry, ceilings and doors as part of office renovation as shown on plans filed herewith. No change to use, occupancy or egres...
Interior demolition of 2nd and 3rd floor office, interior demolition scope only. no change to use egress or occupancy.
Supported Scaffolding for Full Building Demolition
Renovation of an existing apartment #8BB on the 8th Floor. Work include non-structural demolition and general construction as per plans filed herewith.
Hereby filing to demolish and construct interior partitions, millwork, cabinetry, ceilings and doors as part of office renovation as shown on plans filed herewith. No change to use, occupancy or egres...
Interior soft demolition of existing store to include removal of existing partitions and mill work. No change to use, egress or occupancy.
Demolition of doors, fixtures and finishes. New partitions, fixtures, finishes, and doors.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes in the basement & Storefront (LL Work) as per plans. No change to use, egress or occupancy.
Renovation of an existing apartment #8BB on the 8th Floor. Work include non-structural demolition and general construction as per plans filed herewith.
Interior demolition of 2nd and 3rd floor office, interior demolition scope only. no change to use egress or occupancy.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Interior demolition in cellar. No change in use, zoning, or egress.
General construction interior only demolition and renovation of existing 5 family residential building on floors 001 to 006 and cellar. as per plans filed herewith. no change of use, egress, and occup...
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
General construction interior only demolition and renovation of existing 5 family residential building on floors 001 to 006 and cellar. as per plans filed herewith. no change of use, egress, and occup...
Interior demolition in cellar. No change in use, zoning, or egress.