Demolition Permits in Manhattan, New York
923 demolition permits filed recently
923 permits
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Sprinkler alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.
Removal of partitions, plaster, and framing. No structural demolition & no structural partitions to be removed. Wood floors removed to the subfloors & joists to remain in place. All associated work ty...
Demolition of non-load bearing paritions, intallation of new partitions, doors and finishes on the first (1st) floor, apt. 1ds as per plans. no change to use, egress or occupancy.
Interior non-structural demolition as shown on the plans.
Interior 1st floor renovation with selective demolition, new non-load-bearing partitions, new door installation, ceiling adjustments, and finish work as per the architect's plans. there is no change t...
Interior alteration of apartment 9kl on the 9th floor including non-structural partition demolition, new partition work, and new finishes. no change to the use, egress, or occupancy.
Interior alteration of apartment 9kl on the 9th floor including non-structural partition demolition, new partition work, and new finishes. no change to the use, egress, or occupancy.
Removal of partitions, plaster, and framing. No structural demolition & no structural partitions to be removed. Wood floors removed to the subfloors & joists to remain in place. All associated work ty...
Interior non-structural demolition as shown on the plans.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.
Sprinkler alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.
Demolition of non-load bearing paritions, intallation of new partitions, doors and finishes on the first (1st) floor, apt. 1ds as per plans. no change to use, egress or occupancy.
Special permit to zr96-108 to allow demolition of buildings containing dwelling units within the preservation area. and prop. vertical externsion on exist. 4 story building to establish 7 story 7 dwel...
Interior 1st floor renovation with selective demolition, new non-load-bearing partitions, new door installation, ceiling adjustments, and finish work as per the architect's plans. there is no change t...
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Selective interior demolition and construction work on the 9th floor. No change in use, egress, or occupancy.
Filing herewith sprinkler demolition as per plans
Preparation Work for Full Demolition - Removal of Glass Windows