Demolition Permits in Manhattan, New York
923 demolition permits filed recently
923 permits
Construction build out of existing restaurant on 1st floor which is a white box, renovation includes demolition of existing non loading bearing partitions. a new restroom to be added as are new non-lo...
Combination of tax lots & two existing single-family residential townhouses. Exterior masonry, enlarged window masonry openings, interior masonry demolition to connect the existing townhouses, interio...
Filing herewith sprinkler demolition as per plans
Preparation Work for Full Demolition - Removal of Glass Windows
Interior demolition including removal of all non-structural interior partitions, furring and finishes.
Interior demolition as per plans filed herewith. No change to use, egress or occupancy.
Selective interior demolition and construction work on the 9th floor. No change in use, egress, or occupancy.
Combination of tax lots & two existing single-family residential townhouses. Exterior masonry, enlarged window masonry openings, interior masonry demolition to connect the existing townhouses, interio...
Filing herewith sprinkler demolition as per plans
Preparation Work for Full Demolition - Demolition of West Facade for Abatement Access
Preparation Work for Full Demolition - Removal of Glass Windows
Construction build out of existing restaurant on 1st floor which is a white box, renovation includes demolition of existing non loading bearing partitions. a new restroom to be added as are new non-lo...
Full demolition of 2 story rear building at subject premises
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 8th floor (HITT-Office Buildout) as per plans. No change to use, egress or occupancy.
Interior Demolition interior partitions, doors, ceilings and flooring.
Interior Demolition interior partitions, doors, ceilings and flooring.
Full demolition of 2 story rear building at subject premises
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 8th floor (HITT-Office Buildout) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions on the 34th floor as per plans. No change to Use, Egress or Occupancy.
INTERIOR NON-STRUCTURAL DEMOLITION OF EXISTING OFFICE TENANT FIT-OUT Including REMOVAL OF EXISTING NON-LOAD-BEARING PARTITIONS, CEILINGS, FINISHES, AND PARTIAL DEMO OF CORE RESTROOMS as shown on plans...